Treated in stages as the building rises
Termites reach a building from the soil. IS 6313 Part 2 sets out where and how much termiticide emulsion must be applied so the barrier has no gaps. We schedule our visits around your construction programme.
- Foundation trenches and pitsBottom and sides of excavations treated before concreting.
- Backfill around foundationsSoil treated in layers as it is returned against columns and walls.
- Plinth fill and under-floor soilTop surface treated before the floor slab or PCC is laid.
- External perimeterSoil along the outside of the plinth treated after construction to close the barrier.

For builders, contractors and government projects
We work to drawings and BOQs, follow the specified dosage and dilution, and issue a treatment certificate on completion. Records are available for consultants and PMCs.
What the specification covers
Tender documents usually call for pre-construction anti-termite treatment "as per IS 6313 (Part 2)". In practice, that specification sets out:
- Which surfaces are treated at each stage
- The quantity of emulsion per square metre or running metre
- Use of CIB&RC-registered termiticides at the label dilution
- Treatment just before each layer is covered
- Extra care at joints and service entries
- A record of each stage for the consultant
We follow the specification in your contract documents, and log the date, area and quantity of every stage. Our guide to IS 6313 Part 1, 2 and 3 explains the standard in more detail. Building in Gurgaon? See termite control in Gurgaon.